Get a quote
Solar Installation
Solar Installation Solar Panel Installation Solar System Installation Residential Solar Commercial Solar
Solar Equipment
Inverter Installation Solar Battery Installation Battery Backup Systems
Solar Systems
Hybrid Solar Systems Off Grid Solar Systems 3kW Solar System 5kW Solar System 8kW Solar System 10kW Solar System
Repairs & Maintenance
Solar Repairs Solar Panel Repairs Solar Inverter Repairs Solar Maintenance Solar Panel Cleaning
Planning
Solar Installation Prices Solar Finance SSEG Registration Solar System Upgrades
Gauteng
Gauteng Johannesburg Pretoria Midrand
Pretoria East
Pretoria East Garsfontein Moreleta Park Faerie Glen Lynnwood Menlo Park Menlyn Hazelwood Newlands Elardus Park Wingate Park Erasmuskloof Olympus Equestria Wapadrand Die Wilgers Silver Lakes Mooikloof Woodhill
Pretoria Central & North
Waterkloof Brooklyn Groenkloof Monument Park Montana
Centurion
Centurion Lyttelton Irene Eldoraigne Rooihuiskraal Wierdapark
Sandton & Northern Suburbs
Sandton Fourways Bryanston Rivonia Sunninghill Woodmead Kyalami Morningside Illovo Hyde Park Rosebank Houghton
Randburg & West Rand
Randburg Ferndale Northcliff Melville North Riding Honeydew Roodepoort Weltevredenpark Krugersdorp Soweto
East Rand
East Rand Boksburg Benoni Kempton Park Alberton Germiston Springs Bedfordview Edenvale
Company
About Reviews Contact

SSEG Registration Gauteng

Get the best quote, fast
5-Star Reviewed
Home SSEG Registration
SSEG Registration Gauteng - installer fixing a solar panel to the roof mounting rails
  • SSEG Registration Gauteng explains how small-scale embedded generation systems, meaning solar PV and installed battery backup, are registered in Johannesburg, Pretoria, Centurion and the East Rand.
  • Who you register with depends on who sends your electricity bill: City Power, the City of Tshwane, the City of Ekurhuleni, Mogale City or Eskom.
  • Most installers handle registration as part of the job. Make sure it is on the quote.

Tell us whether you need a new installation or help registering an existing system.

Get SSEG Registration Quotes

This page summarises published requirements in plain language. Requirements, fees, tariffs and forms change, and each utility runs its own process. Confirm current details with your supplier or a qualified installer before you rely on them.

Who You Register With in Gauteng

Your bill comes fromTypical areasWhere to start
City PowerMost of Johannesburg, including Randburg, Roodepoort, Northcliff, Melville, Rosebank and parts of SandtonCity Power's SSEG office, citypower.co.za
City of TshwanePretoria, Pretoria East and CenturionTshwane's electricity department; queries to sseg@tshwane.gov.za
City of EkurhuleniEast Rand, including Boksburg, Benoni, Kempton Park, Germiston, Alberton, Springs, Bedfordview and EdenvaleEkurhuleni's electricity department
Mogale CityKrugersdorp and surroundsMogale City's electricity department
Eskom (direct)Soweto, and parts of Midrand, Sandton, Fourways, Kyalami and outlying smallholdingsEskom's SSEG application process

What Needs to Be Registered

SystemRegistration
Grid-tied solar PVRequired
Hybrid solar with batteryRequired
Installed battery backup system wired into the DB boardRequired
Plug-in trolley inverter or portable power stationGenerally excluded
Solar water heater or geyserExcluded
Off-grid system with no possible grid connectionNot a grid connection; CoC still required

Key Requirements

  • Approval before connection. City Power and the City of Tshwane expect the application to be approved before the system is installed or connected. Do not let an installer connect first and apply later.
  • Approved inverter. The inverter must be tested to NRS 097-2-1, with the certificate for the exact model number.
  • Certificate of Compliance. Issued by an electrician registered with the Department of Employment and Labour.
  • Documentation. Application form, single-line diagram showing the point of connection, equipment specifications, and proof of ownership or the owner's authorisation. Some utilities also ask for professional sign-off or building plan approval.
  • Metering. City Power installs a bidirectional (smart) meter at the customer's cost and moves SSEG customers from prepaid to postpaid. Tshwane requires a bidirectional meter before any export is allowed.
  • Export control. Systems that are not approved to export must prevent power flowing back into the grid.

The Registration Process

  1. Check your bill to confirm whether City Power, Tshwane, Ekurhuleni, Mogale City or Eskom supplies you.
  2. Your installer confirms the inverter has NRS 097-2-1 certification before buying it.
  3. The application, single-line diagram and supporting documents are submitted to your utility.
  4. The utility reviews the application and may inspect the site, then issues pre-approval.
  5. The system is installed and commissioned.
  6. The CoC and commissioning documents are submitted.
  7. Metering is changed where required, and you receive final written approval. Keep it with your property documents.

SSEG Costs

ItemIndicative cost (incl. VAT)
Utility application and meter changeVaries by utility; confirm current fees before applying
Eskom connection fees (Eskom customers)Eskom has waived fees for systems up to 50kVA registered by 30 September 2026; check whether this has been extended
Single-line diagram and documentsR1,500 - R4,000
Professional sign-off, where requiredR1,500 - R5,000
Certificate of ComplianceR1,500 - R4,500
Registering an existing system (inspection, fixes, paperwork)R3,500 - R12,000+

Ask about ongoing costs as well as once-off fees. Moving to a postpaid or SSEG tariff can raise your monthly fixed charges, which changes the payback on a small system.

Compare installers who include the full SSEG process in their quote.

Compare Solar Installers Gauteng

Selling Power Back in Gauteng

Export is more limited in Gauteng than in some other metros. Where it is allowed, you need approval and a bidirectional meter, and the feed-in rate is usually well below what you pay for electricity. Tshwane reviews its tariffs every July, and City Power and Ekurhuleni set their own terms. Most Gauteng homes size systems to use their own solar rather than to export. Check the current terms before counting on export income.

Registering an Existing System

Many older systems were installed without registration, or with an inverter that does not have NRS 097-2-1 certification. A technician can inspect the installation, correct wiring and protection, issue a new CoC and prepare the documents. If the inverter is not approved, it may need to be replaced first. See solar inverter repairs for replacement considerations.

Why Registration Matters in Practice

  • Selling your home. Buyers, agents and conveyancers increasingly ask for the CoC and SSEG approval.
  • Insurance. Insurers may query claims involving uncertified electrical work, which matters in a province with frequent hail and lightning.
  • Export. Only registered systems with the right meter can export legally.
  • Compliance. Utilities can issue notices and disconnect unregistered systems, and penalties have been announced for systems that are not registered.

Common Reasons Applications Are Delayed

  • Inverter certificate not matching the installed model exactly.
  • Missing or incorrect single-line diagram.
  • Applying to the wrong utility, for example City Power when Eskom supplies the property.
  • CoC not covering the solar or battery installation.
  • Owner's authorisation missing where a tenant or agent applies.
  • Backlogs at the utility. Ask your installer what turnaround they are currently seeing.

Solar Installers Gauteng compares installers who handle registration for you. For the full installation process, see solar installation in Gauteng.

SSEG Registration Questions

Do I need to register my solar system in Gauteng?

Yes, if it is connected to or can connect to the grid. This includes installed battery backup systems, not only solar panels.

Who do I register with?

Whoever sends your electricity bill: City Power in most of Johannesburg, the City of Tshwane in Pretoria and Centurion, the City of Ekurhuleni on the East Rand, Mogale City in Krugersdorp, or Eskom if you are an Eskom customer.

Do I need to register if I do not export power?

Yes. Grid-connected systems must be registered whether or not they export.

Will registering change my electricity account?

It can. City Power moves SSEG customers from prepaid to postpaid with a smart meter, and some tariffs carry higher fixed charges. Ask your utility or installer before applying.

Is a trolley inverter an SSEG system?

Plug-in trolley inverters and portable power stations are generally excluded, because they are not wired into the electrical installation.

Can I register a system installed years ago?

Yes, usually after an inspection, any corrections needed, a current CoC and the required documents. An inverter without NRS 097-2-1 certification may need replacing.

Can I earn money from my solar system in Gauteng?

Only a little, in most cases. Export needs approval and a bidirectional meter, and feed-in rates are low. Most systems are sized to use their own power.

Related Solar Services

Solar Installers Gauteng is a free quote-comparison service. Installation, repair and maintenance work is carried out by the independent solar installers that quote you, and your contract is with the installer you appoint. Ask each installer for a written, itemised quote, the registered electrician who will issue the Certificate of Compliance, and their equipment and workmanship warranty terms before appointing anyone.

SSEG Registration Gauteng. Compare installers who include City registration in the job.

Get 5 Quotes

Get SSEG Registration Quotes

Tell us about your new or existing system, and solar installers covering Gauteng will quote directly.

Free to use, no obligation. Your request goes to LEADERR APPROVED solar installers covering Johannesburg, Pretoria and the rest of Gauteng, who quote you directly.

Client Reviews

Powered by leaderr